Renewable Energy Directive (RED III)

RED III

Renewable Energy Directive (RED III)

RED III is implemented in Ireland through European Union (Planning and Development) (Renewable Energy) Regulations 2025 (SI 274 of 2025).  European Union (Planning and Development) (Renewable Energy) (No.2) Regulations 2025

  • Most provisions effective 6 August 2025.
  • EIA opinion provisions come into force 1 May 2026.

Scope of Regulations 

Applies to renewable energy from non-fossil sources:

  • Wind, solar, geothermal, osmotic, ambient, tide, wave, ocean energy.
  • Hydropower, biomass, landfill gas, sewage treatment plant gas, biogas.
  • Repowering developments (upgrading existing renewable projects).
  • Small-scale installations including heat pumps and solar energy equipment.

Sustainable Energy Authority of Ireland (SEAI) guides applicants through the permit process. 

Homepage | Single Point of Contact | SEAI

  • Phone: 01 808 2278
  • Email: spc@seai.ie

Pre-Planning

Completeness Check introduced to ensure applications are correct before timelines start.

Pre-application consultation with prescribed bodies is strongly encouraged.

Guidance and checklist available in Circular CEPP 1/2025 (pages 11–14) 

Application Process & Timelines

Applications must use the Council’s Planning Application Form.

Decision timelines (once application is confirmed complete):

  • Renewable energy ≥150kW: 52 weeks (onshore) | 65 weeks (offshore).
  • Extended deadline for IROPI cases: 2 years (onshore) | 3 years (offshore).
  • Renewable energy <150kW & repowering: 30 weeks | Extended: 1 year.
  • Ground source heat pumps & relevant solar: 8 weeks | No extension.
  • Small-scale solar or non-ground source heat pumps: 4 weeks | No extension.

Important Rules

  • Timelines cannot be paused for further information or environmental assessments.

Further information requests disapplied for:

  • Relevant solar energy development.
  • Small-scale solar energy equipment.
  • Heat pumps.
  • For other developments, requests must be issued within 8 weeks of completeness check notice, with a specified reply period.
  • Failure to respond within the specified period = application withdrawn.

Appeals

Decisions on RED III applications can be appealed directly to An Coimisiún Pleanála.

RED III Register

RED III 2025

RED III Planning Reference Number Received Date Applicant Details Proposed Development Details Townland Validation Sheet and ack letter sent Completeness Checklist sent Decision Due Submissions Due Deadline for the completeness check to be issued Application Status Referred to spc@seai.ie
25/61293 10/09/2025 Tuam Energy Park Limited For the construction of and a 40-year operation and subsequent decommissioning of a 48.01-hectare solar farm (red line boundary) and underground cabling. The solar farm comprises of one single land parcel and is divided by existing farm access tracks and hedgerows. The proposed Solar Farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures, together with electrical transformers, transformer maintenance bays, a temporary construction compound, the use of existing farm access tracks, existing site entrance, inverters, CCTV poles and cameras, deer type security/boundary fencing, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity. A Natura Impact Statement will also be submitted to the Planning Authority with this application. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413). It is important to note that the planning application is subject to section 34D. When a notice issues in accordance with section 34(b), the provisions of article 26A shall apply Shantallow, Cloonascragh, Togher More 17/10/2025 23/10/2025 10/05/2026 14/10/2025 24/10/2025 Grant with 27 conditions by GCC. FI (4/11/25), FI rec. 16/03/2026 Y
25/61318 12/09/2025 BNRG Shessy Limited     INVALID         INVALID Y
25/61380 24/09/2025 BNRG Shessy Limited For a proposed solar farm development consisting of: linear arrays of solar PV panels on ground mounted steel supported structures with associated cabling and ducting; 12 no. proposed single storey MV stations; 1 no. Battery Energy Storage System (BESS) installation (including 32 no. containers with cells and 8no. Power Conversion System (PCS) MV Stations) with associated security fencing and gates; Site perimeter fencing; 4 no. new permanent site entrances, 1 no. new temporary site entrance, 1 no. upgrade to an existing site entrance; Security gates at all permanent and temporary access points; Site access tracks including passing and turning bays; 3 no. temporary construction compound/carpark/material storage areas with associated temporary site offices, parking areas and security fencing; 6 no. steel storage containers; 6 no. turning bays; On-site pole mounted CCTV cameras; 3 no. temporary construction stage Moby Dick type wheel wash systems; 3 no. concrete wash out locations (one within each temporary construction compound); and, all associated and ancillary works. The proposed solar farm development spans a total site area measuring 86.3ha. Permission is sought for a period of 10 years with an operational period of 40 years. The export capacity to the grid is estimated to be up to 70 MW. The development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413). The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Appropriate Assessment Screening Report (AASR) and Natura Impact Statement (NIS) has been prepared for this development and submitted with this planning application. A separate application to obtain permission for a 110kV grid connection and 110kV substation to facilitate the export of power from the solar farm, will be submitted to An Coimisiún Pleanála. The planning application including the AASR and NIS Shessy North, Shessy South, Lydacan South South Galway Co. Galway 26/10/2025 07/11/2025 18/11/2025 28/10/2025 07/11/2025 Appealed PL-500475-GY-25 (Grant with 29 conditions by GCC), Appeal withdrawn. Y
25/61412 29/09/2025 Gannow Ltd. Permission for a period of 10years for a 
development. The development will consist of the provision of the following: i. 8 no. wind turbines with an overall turbine total tip height range of 178m - 185m, a rotor diameter range of 149m - 163m, and turbine hub height range of 101m - 104m, and associated foundations and hardstanding areas; ii. A permanent 38kV substation compound (including a control building (157.6 sq. m) with welfare facilities, all associated electrical plant and apparatus, security fencing, underground cabling, storage containers, wastewater holding tank, site drainage and all ancillary works); iii. Permanent underground electrical (38kV) and communications cabling to the existing Cashla Substation in the townland of Barrettspark (including joint bays, communication and earth sheath link chambers and all ancillary works along the route). This cabling route is primarily located within the public road corridor which includes protected structures (RPS No. 3747, RPS No. 146). iv. Underground electrical (20/33kV) and communications cabling connecting the wind turbines and meteorological mast to the proposed on-site substation; v. 2 no. temporary construction compounds (including site offices and welfare facilities (with a combined floor area of 202.5 sq.m)); vi. A meteorological mast with a height of 30 metres, security fencing and associated foundation and hard-standing area; vii. Upgrade of existing site tracks/ roads and provision of new site access roads, junctions and hardstand areas, including a new site entrance off the L3115; viii. Peat and Spoil Management Areas; ix. Tree felling and vegetation removal; x. Biodiversity enhancement measures (including peatland habitat enhancement, Marsh Fritillary habitat enhancement and management, establishment of hedgerows and native woodland planting); xi. Site drainage; xii. Operational stage site signage; and xiii. All ancillary works and apparatus. A thirty five-year operational life from the date of full commissioning of the wind turbines and subsequent decommissioning is being sought. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany this application. An Opinion on Unconfirmed Details issued by Galway County Council (Opinion Ref. No. 25/MP/2) on 29th May 2025 accompanies this application. The details unconfirmed in this application are the turbine total tip height, rotor diameter and hub height. The range of parameters under which the turbine dimensions will fall are specified on this notice in item i. above and further detailed in the Opinion on Unconfirmed Details that accompanies this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Gannow, Attimonmore South, Attimonbeg, Attimonmore North, Ballynanulty, Cloonkeenmore North, Cloonkeenbeg, Toorkeel, Lisdoran, Binn, Bingarra, Graigabbey, Carrowntober East, Carrowntober West, Ballydavid North, Ballydavid Middle, Skeaghaderreen, Mountain North, Park, Fahysvillage, Castle Ellen, Pollagh, Saintellen, Carnaun, Tobernavean, Castlelambert, Caraunduff, Knocknacreeva, Caherbriskaun, Lisheenkyle East, Barrettspark, Cashla, Cappanasruhaun, Cappaghnanool, Derrynamanagh and Killimor, Co. Galway. 30/09/2025 10/11/2025 23/11/2025 02/11/2025 12/11/2025 Appealed PL-500493-GY-25 (Refused by GCC) Y
25/61691 18/11/2025 Cycle 0 IE Limited For the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured), and a bio-based fertiliser from organic material. The development is a renewable energy development which is covered by the provisions of the Renewable Energy Directive III. The development will consist of the following: Demolition and site clearance works including the removal of an existing shed and adjacent hard standing areas and tank structure, located centrally on the site. Construction of 2 no. primary digesters, a pump house, and 2 no. post digester tanks, located in the northwestern section of the site. Construction of 2 no. prepits, a pasteurisation buffer tank, and a pasteurisation unit, located to south of the primary digesters, within the western section of the site. Construction of a digestate storage tank located centrally on site, to the southeast of the primary and post digester tanks. Construction of a digestate treatment building and a feedstock reception building with an odour abatement system, located in the southwestern section of site. Construction of combined heat and power (CHP) unit, a biogas boiler, a backup boiler, and a gas treatment system, located in the southeast section of the site. Construction of a CO2 liquefactor and an emergency/ safety flare a grid injection unit, a fuel storage tank and a propane tank compound accommodating 2 no. propane tanks, located in the southern section of the site. Construction of roofed silage clamps located centrally on site. Construction of a two storey office building and an ESB substation within the eastern section of the site, adjacent to the site entrance. Alterations to the adjacent local road frontage including improved access arrangements and boundary setback to allow for improved access and safety. Associated and ancillary works including parking (8 no. standard, 3 no. EV and 1 no. accessible parking spaces and bike storage for 12 no. bikes), a weighbridge, solar PV arrays at roof level, wastewater treatment equipment, bunding and surface treatments, attenuation pond, boundary treatments, lighting, services, drainage, landscaping, and all associated and ancillary works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted with this planning application. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply Glenloughaun Ballinasloe 24/11/2025 15/12/2025 21/01/2026 22/12/2025 01/01/2026 Appealed PL-500821-GY-26 (Refused by GCC) Y
25/61903 19/12/2025 Ballydonagh Solar Limited The development will consist of several minor amendments to the previously consented development under Planning Reference 2361049 (by Galway County Council). The amendments comprise the following; re alignment of the main entrance and access gate; re alignment and widening of internal access tracks; alteration of the boundary fence; removal of the consented 38kV substation in Field 22; combined central inverters and MV transformers are replaced by separate string inverters and central MV transformers; reduction in the size of related hardstanding areas; updated table layout including a reduction in PV table numbers from 3209 to 3120; reduction of the of new overhead line separation areas arising from the removal of a section of the 110 kV overhead line; inclusion of an additional badger sett buffer and amendment of condition 3a to extend the operational lifetime of the solar farm from 35 years to 40 years. An updated Natura Impact Statement has been submitted with this application. A separate application to obtain permission for a 110kV grid connection and 110kV substation to facilitate the export of power from the solar farm, will be submitted to An Coimisiún Pleanála. Ballydonagh, Cloonineen, Skecoor, Kiltormer East and Graveshill 06/01/2026 03/02/2026 21/02/2026 26/01/2026 01/02/2025 Grant with 23 conditions by GCC Y
25/61935 23/12/2025 Tuam Energy Park Ltd     INVALID         INVALID Y

RED III 2026

RED III Planning Reference Number Received Date Applicant Details Proposed Development Details Townland Validation Sheet and ack letter sent Completeness Checklist sent Decision Due Submissions Due Deadline for the completeness check to be issued Application Status Referred to spc@seai.ie
2660009 08/01/2026 Ballydonagh Solar Limited several minor amendments to the previously consented development under Planning Reference 2461749 (by Galway County Council). The amendments comprise the following; Combined central inverters and MV transformers are replaced by separate string inverters and central MV transformers which results in a reduction in the extent of associated hardstanding areas; alteration to Condition 3(a) to extend the operational lifetime of the solar farm from 35 years to 40 years; addition of tables in the former central inverter locations. An updated Natura Impact Statement has been submitted with this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply Ballydonagh, Cloonineen, Skecoor, Kiltormer East and Lisheenaguil, 14/01/2026 23/02/2026 04/03/2026 11/02/2026 21/02/2026 Grant with 23 conditions by GCC Y
2660031 15/01/2026 Tuam Energy Park Ltd for amendments to a solar energy development permitted under Galway County Council Planning Register Reference 20/1387 as follows: Omission of c. 1.92ha of solar panels; insertion of c. 1.30ha of solar panels, within the footprint of the permitted solar energy development; revised configuration of solar panels and alteration to spacing between the solar array rows to allow for 2.5m spacing; alteration to the design and location of the electrical inverter/transformer units and reduction in the number of electrical inverter/transformer units from 20 no. to 14 no. ; 1 no. additional site entrance from the L6141 local road; revised locations of 1 no. site entrance from the L6141 local road and 1 no. site entrance from the L6143 local road; increase in the operational lifetime of the development from 25-years to 40-years from the date of commissioning; and, all associated site development, drainage, access and reinstatement works. A Natura Impact Statement will be submitted to the Planning Authority with the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply Cloontoa, Rinkippeen, Cloonascragh, Barnacurragh and Ballykeaghra Tuam Co. Galway INVALID (19/01/2026)   11/03/2026 18/02/2026 28/02/2026 INVALID Y
2660120 30/01/2026 Tuam Energy Park Ltd for amendments to a solar energy development permitted under Galway County Council Planning Register Reference 20/1387 as follows: omission of c. 1.92ha of solar panels; insertion of c. 1.30ha of solar panels, within the footprint of the permitted solar energy development; revised configuration of solar panels and alteration to spacing between the solar array rows to allow for 2.5m spacing; alteration to the design and location of the electrical inverter/transformer units and reduction in the number of electrical inverter/transformer units from 20 no. to 14 no.; 1 no. additional site entrance from the L6141 local road; revised locations of 1 no. site entrance from the L6141 local road and 1 no. site entrance from the L6143 local road; increase in the operational lifetime of the development from 25-years to 40-years from the date of commissioning; and, all associated site development, drainage, access and reinstatement works. A Natura Impact Statement will be submitted to the Planning Authority with the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply Cloontoa, Rinkippeen, Cloonascragh, Barnacurragh and Ballykeaghra Tuam Co. Galway INVALID (02/05/2026)   26/03/2026 05/03/2026 15/03/2026 INVALID Y
2660183 07/02/2026 Tuam Energy Park Ltd for amendments to a solar energy development permitted under Galway County Council Planning Register Reference 20/1387 as follows: i) Omission of c. 1.92ha of solar panels; ii) Insertion of c. 1.30ha of solar panels, within the footprint of the permitted solar energy development; iii) Revised configuration of solar panels and alteration to spacing between the solar array rows to allow for 2.5m spacing; iv) Alteration to the design and location of the electrical inverter/transformer units and reduction in the number of electrical inverter/transformer units from 20 no. to 14 no.; v) 1 no. additional site entrance from the L6141 local road; vi) Revised locations of 1 no. site entrance from the L6141 local road and 1 no. site entrance from the L6143 local road; vii) Increase in the operational lifetime of the development from 30-years to 40-years from the date of commissioning; and, viii) All associated site development, drainage, access and reinstatement works. A Natura Impact Statement will be submitted with the application Cloontoa, Rinkippeen, Cloonascragh, Barnacurragh and Ballykeaghra Tuam Co. Galway   19/03/2026 17/06/2026 13/03/2026 23/03/2026 Grant with 27 conditions by GCC. FI received 23/04/26 Y
2660293 24/02/2026 Robin Solar Ltd. for a 10 year permission for development. The development will consist of the construction of a solarphotovoltaic (PV) farm with an operational lifespan of c.35-years and an export capacity of c.36MW. The works will comprise of: ground-mounted PV panels arranged in rows; ancillary electrical works including cabling, string inverters, transformer stations, ducting, and underground connections; internal access tracks; storage containers; site lighting; pole-mounted CCTV cameras; perimeter fencing; and a temporary construction compound. Access arrangements to the solar PV farm via the existing agricultural entrance on the R446, which will be upgraded as part of this application. Relocation and reinstatement of stonewalls and selective removal of hedgerows to facilitate the development and provide appropriate site access/egress, with works minimised and accompanied by replacement planting and conservation measures for stone walls. Creation of a biodiversity area in the southwest of the site to enhance ecological value. Hard and soft landscaping works, including internal access roads, drainage features, a berm in the southwest of the site, boundary treatments, and planting. Installation of an underground cable route, including joint bays, along the R446, access roads, and through agricultural lands, to connect the proposed solar PV farm to the previously permitted 110 kV substation under An Coimisiún Pleanála Case No. 310141-21, which will also be connected to the solar PV farm permitted under Galway County Council Reg. Ref. 17/1544. All associated site development works, including above and below ground services, across a total site area of 39.52ha. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply Bushfield, Derrydonnell Beg, Shantallow, and Moyveela INVALID (03/02/2026)   20/04/2026 30/03/2026 09/04/2026 INVALID Y
2660398 13/03/2026 Robin Solar Ltd. for the construction of asolar photovoltaic (PV) farm with an operational lifespan of c.35-years and an export capacity ofc. 36MW. The works will comprise of: (1) Ground-mounted PV panels arranged in rows; ancillary electrical works including cabling, string inverters, transformer stations, ducting, and underground connections; internal access tracks; storage containers; site lighting; pole-mounted CCTV cameras; perimeter fencing; and a temporary construction compound. (2)Access arrangements to the solar PV farm via the existing agricultural entrance on the R446,which will be upgraded as part of this application. (3) Relocation and reinstatement of stonewalls and selective removal of hedgerows to facilitate the development and provide appropriate site access / egress, with works minimised and accompanied by replacement planting and conservation measures for stone walls. (4) Creation of a biodiversity area in the southwest ofthe site to enhance ecological value. (5) Hard and soft landscaping works, including internal access roads, drainage features, a berm in the southwest of the site, boundary treatments, and planting. (6) Installation of an underground cable route, including joint bays, along the R446,access roads, and through agricultural lands, to connect the proposed solar PV farm to the previously permitted 110 kV substation under An Coimisiún Pleanála Case No. 310141-21,which will also be connected to the solar PV farm permitted under Galway County Council Reg.Ref. 17/1544. (7) All associated site development works, including above and below ground services, across a total site area of 39.52ha. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. The planning application has included an NIS Bushfield, Derrydonnell Beg Shantallow, Moyveela Co. Galway 23/03/2026 24/04/2026 25/11/2026 04/11/2026 26/04/2026 FI Rec. on 01/10/2026 Y
2660431 23/03/2026 Swan Solar Limited The proposed development consists of: the installation of photovoltaic (PV) panels mounted on ground-based support structures across Parcels A–D; provision of electrical transformer and inverter station modules; construction of internal access routes to serve the subject parcels; provision of security fencing, CCTV, and associated ancillary infrastructure; installation of underground electrical cabling and ducting (including a section of underground cabling and ducting along a section of the L3103 connecting Parcel C to Parcel D (c. 0.28 hectares)); provision of site drainage infrastructure; implementation of landscaping and habitat enhancement measures, including hedgerow planting and reinforcement, reseeding, and ecological mitigation; and all associated site development works. The proposed development also includes the upgrade of two (2 No.) site access points to serve Parcels C and D from the R339 and the L3103, respectively, while Parcels A and B will be accessed via the existing and permitted access points approved under Reg. Ref. 20/961 and Reg. Ref. 22/61105. The proposed solar farm will operate for a period of 35 years. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. Ballymoneen, Grange East, Cashla and Moor Co. Galway. 25/03/2026 01/05/2026 17/05/2026 26/04/2026 06/05/2026 FI Y
2660466 27/03/2026 Regnum Renewables Developments Limited for a 10 year planning permission, for a 240MWh battery energy storage systems facility within a total site area of up to 3.02 hectares. The development will include: 1 no. 38kV substation compound including 1 no. single storey electrical substation building with an area of 69m2 and associated Switchgear, 12 no. electrical inverters, and 6 no. electrical transformers, 31 no. containerised battery storage modules on concrete plinths, access tracks and new site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV security monitoring and lighting system, landscaping works and all associated ancillary infrastructure Townland of Somerset Co Galway Ireland           INVALID Y
2660805 21/05/2026 Tuam Energy Park Ltd for amendments to the transformer compound development permitted under Galway County Council Planning Register Reference 25/60096 as follows: Modifications to the consented transformer compound palisade fence to include a single pedestrian access gate; construction of an interface (marshalling) kiosk and plinth located at the boundary between the transformer compound and the existing Cloon 110kV substation (interface kiosk to be enclosed by 2.6m tall palisade fence including a gate); construction of approx. 15m (length) of 1.5m wide walkway comprising of crushed limestone on geotextile, to connect Cloon substation fenced enclosure with the interface (marshalling) kiosk fenced enclosure; approx. 50m of 110kV underground electrical cable connecting the transformer compound to the existing Cloon Substation; construction of 6.5m high x 13m long fire wall within compound and; all associated site development, drainage, access and reinstatement works. A Natura Impact Statement will be submitted to the Planning Authority with the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply Cloonascragh Tuam Co. Galway 27/05/2026 06/07/2026 15/07/2026 24/06/2026 03/07/2026 Grant with 12 conditions by GCC. Y
26155 24/06/2026 C & F Tooling Ltd. to renew planning permission for 2 no test wind turbines previously granted under planning permission Ref No - 20/101; all ancillary work. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply Moor, Athenry Co. Galway           INVALID  
26166 02/07/2026 C & F Tooling Ltd. to extend windturbine test site to rear of factory premises. 10 11 No 20-30Kw wind turbines 31m height to tip of propeller. 2) All other ancillary site works Moor, Athenry Co. Galway           INVALID  
2661362 07/08/2026 Heron Solar Ltd. A 10-year planning permission for the development of a solar farm on a site of 239 hectares consisting of the following: 1,031,319 sq. m. of solar photovoltaic panels on ground mounted steel frames; 32 no. MV stations on associated hardstanding; new internal access tracks; underground cabling and ducting including along public roads L7138, L7141, L3110, L7140, L31085, L3108, L7132, L7131, and L7129; new access points onto public roads L7138, L3110, L7141, L7129, L71383, and upgrades to existing access points are proposed on public roads L7141, L3110, L7140, L7132, L7129, and L71383; limited alterations to existing stone walls including the creation or widening of access openings and reinstatement works; security fencing; CCTV; drainage infrastructure; landscaping and biodiversity enhancement measures; Horizontal Directional Drilling beneath the disused railway line; temporary construction compounds; and all associated ancillary site development works. The proposed development will be operational for 40 years. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply Lissaniska, Oakwood South, Cahernaglass, Ryehill Demesne, Carrowmore, Parkacurry, Killaclogher, Ballynaboorkagh, Cashlaundarragh, Corrafaireen, Shantallow, Carrowreagh East, Caherlissakill, and Laragh Beg 08/12/2026 (E. K) 21/09/2026 01/10/2026 10/09/2026 21/09/2026 Refused Y
2661567 16/09/2026 Blackthorn Solar Farm Ltd for a 10 Year Planning Permission for a solar farm with a total area of circa 93 hectares. The proposed development will consist of a solar farm comprising of c. 352,500 sq.m of solar photovoltaic panels on ground mounted frames, associated string inverters mounted to rear of panels, 18 no. single storey electrical transformer stations, 3 no. spare parts containers and 1 no. office unit. The overall project will also consist of underground electrical ducting and cabling within the development site and within the R354 public road, temporary construction compounds, security and acoustic fencing, CCTV, access tracks, landscaping, drainage and all ancillary development works and apparatus necessary to facilitate the proposed development. Construction and operational access will be via 2 no. existing entrance from the N83 and L21332 which will be subject to upgrades. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply Cahernashilleeny, Knockdoebeg West, Knockdoemore, Knockdoemore and Lackagh Beg (Townlands) Lackagh, Turloughmore County Galway 23/09/2026   10/11/2026 20/10/2026 30/10/2026   Y
26253 24/09/2026 C & F Tooling Ltd. to extend wind turbine test site to rear of factory premises to include; 1) 11 No 20-30Kw wind turbines 31m height to tip of propeller. 2) All other ancillary site works. The development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) Moor, Athenry Co. Galway 02/10/2026   18/11/2026 28/10/2026 06/11/2026   Y